Client: City Peninsula Residential Development
Location: Greenwich Peninsula, London SE10
Contractor: Future Lighting and Electrical
Completion Date: November 2024
Project Overview:
Future Lighting and Electrical recently completed a comprehensive LED lighting upgrade at the City Peninsula development in London SE10. The project was initiated in response to the poor condition and non-compliance of the existing internal lighting system, which had become both inefficient and unreliable.
Following a detailed assessment, Future Lighting and Electrical supplied and installed new high-efficiency LED lighting throughout the building. These state-of-the-art fixtures included built-in microwave sensors, enabling automatic operation based on occupancy. This upgrade significantly improves energy efficiency, enhances lighting quality, and ensures full compliance with current electrical and emergency lighting safety standards.
The new system not only reduces operational costs through lower energy consumption and maintenance requirements but also supports the building’s commitment to sustainability and modern living standards. Residents and building management have already noted improved visibility, reliability, and overall functionality of the internal lighting systems.
This project demonstrates Future Lighting and Electricals commitment to delivering innovative, energy-efficient solutions tailored to the unique needs of residential developments.
Client Objectives:
Ensure Regulatory Compliance
The existing internal lighting system was non-compliant with current building regulations and health & safety standards. A key objective was to bring all lighting installations in line with relevant electrical codes and safety requirements including a full replenishment of the emergency lighting system with the required amount of combined emergency lighting fixtures.
Improve Lighting Efficiency and Performance
Many of the previous fixtures were outdated and failing. The goal was to replace them with modern LED equivalents that offer improved light output, reliability, and lifespan while reducing maintenance demands.
Reduce Energy Consumption and Operating Costs
By installing energy-efficient LED lighting with integrated microwave sensors, the project aimed to significantly reduce electricity usage, contributing to lower utility bills and reduced carbon footprint for the building.
Enhance User Comfort and Building Aesthetics
Upgraded lighting was intended to create a brighter, safer, and more welcoming environment for residents and visitors, particularly in communal areas such as hallways, lobbies, and stairwells.
Steps of Implementation
The LED lighting upgrade at City Peninsula was executed with precision, efficiency, and professionalism from start to finish. The process was managed by Future Lighting and Electricals dedicated team of skilled engineers, whose attention to detail and expertise were consistently praised throughout the project by building management and residents alike.
- Initial Assessment & Planning
A thorough survey of the existing lighting system was conducted to identify non-compliance issues and performance gaps. A tailored lighting design plan was then developed, ensuring optimal placement, efficiency, and regulatory adherence. - Preparation & Decommissioning
All outdated and non-compliant light fittings and fixtures were carefully removed and responsibly disposed of off-site in accordance with environmental and waste management standards. - Installation of LED Lighting with Microwave Sensors
New energy-efficient LED lights with integrated microwave sensors were installed across all internal areas. The fixtures were chosen specifically for their performance, longevity, and smart-sensing capabilities, ensuring lights would only activate when needed. - Programming for Maximum Efficiency
Each individual light was programmed and calibrated based on its specific location and surrounding environment to ensure it operated at maximum efficiency—balancing energy savings with optimal illumination for safety and comfort. - Seamless Delivery & Early Completion
Thanks to meticulous planning and the professionalism of the engineering team, the project was delivered ahead of schedule and without a single issue. The installation process was smooth and minimally disruptive to residents and daily operations within the building. - Testing, Commissioning & Quality Assurance
Upon completion, the entire lighting system underwent a full testing and commissioning phase. Every unit was rigorously checked to confirm full functionality, proper sensor operation, and compliance with the original design specifications. - Post-Implementation Performance
Since the upgrade, the system has performed flawlessly with zero reported issues. The client is already benefiting from the low-maintenance nature of the installation, with improved lighting quality, reduced running costs, and no need for reactive maintenance.
Results & Benefits
- 5-Year Warranty – Parts & Labour
The entire installation is covered by a comprehensive 5-year warranty, including both parts and labour, offering long-term peace of mind for the client. - Continued Aftercare & Strong On-Site Relationships
Future Lighting and Electrical continues to provide aftercare support, maintaining the strong working relationship established with the on-site facilities and management teams. - Significant Energy Savings
The transition from outdated fluorescent fittings to modern LED equivalents has resulted in a substantial reduction in energy consumption, cutting operational costs and supporting sustainability goals. - Drastic Reduction in Unnecessary Usage
Previously, many internal lights were operating 24/7. The new system, featuring individual occupancy sensors with a 90-second hold time, ensures lighting is only active when needed—leading to further efficiency gains and prolonged fixture lifespan. - Improved Safety Through Enhanced Lighting
Corridors and communal areas are now brightly and evenly lit, providing a safe and comfortable environment for residents and visitors during normal operation. - Fully Compliant Emergency Lighting System
A compliant, combined emergency lighting solution has been integrated, delivering safe and clearly illuminated escape routes throughout the building for the full required duration in the event of power failure or emergency. - Complete Certification & Documentation
On completion, all relevant certification and full O&M (Operation & Maintenance) documentation were provided, ensuring transparency, regulatory compliance, and ease of future management.
Conclusion
The successful completion of the LED lighting upgrade at City Peninsula marks a significant milestone for Future Lighting and Electrical—not only in terms of quality and delivery, but also in scale. With over 500 internal light fittings replaced, this stands as our largest lighting upgrade project to date, showcasing our capacity to deliver high-volume, high-impact solutions with precision and professionalism.
The replacement of the building’s outdated, non-compliant lighting infrastructure with modern, energy-efficient LED systems has resulted in vastly improved illumination, enhanced safety, and substantial energy savings. Every fitting was carefully selected, installed, and programmed to operate at maximum efficiency, with integrated microwave occupancy sensors tailored to the environment they serve.
Delivered ahead of schedule and without a single issue, the project reflects the dedication and expertise of our engineering team, who earned consistent praise from the on-site management throughout. The implementation of a fully compliant emergency lighting system further reinforces the building’s safety standards, providing peace of mind in any power loss or emergency situation.
All works were supported with full certification and comprehensive O&M documentation at handover, and the client is already experiencing the benefits of zero-maintenance performance since completion.
Beyond technical achievement, this project highlights the strong working relationship we’ve built with the City Peninsula team—a foundation we’re proud to carry forward as part of our continued aftercare commitment.
Future Lighting and Electrical is proud to have delivered this flagship project and looks forward to bringing the same level of excellence and efficiency to future developments across London and beyond.