Future Fuel: Boardwalk Place

EV Charging Solution at Boardwalk Place, Canary Wharf

Location: boardwalk Place, Canary Wharf, London

System Type: Retro-fit – 6-Bay Shared Use Charging Station (7-22kW) with Smart Active Connection

Property Type: Residential Block

 

Property Overview

Boardwalk Place is a prime residential location just a five-minute walk from Canary Wharf’s shops, restaurants, and business hub. With convenient access to London’s Tube, DLR, and City Airport, the estate offers excellent connectivity to the heart of the capital.

 

Management Company: Bespoke Property Management
Instructing Party: Mihai Lamba – Head of Estate Management

 

Project Overview

After thorough planning and collaboration with the management company, it was determined that the ideal location for the EV charging solution would be along the estate’s entry road, utilising the visitors’ parking bays. These charging points are designed for residents to use on a “charge and move” basis, ensuring efficient use of the spaces.

 

An in-depth energy analysis revealed an adequate electrical supply within the site, which was integrated into the new charging solution. To prevent overloads and ensure smooth operation, we incorporated smart load-balancing technology, allowing the available electrical supply to be distributed evenly across all active charging outlets.

 

Given the open nature of the site, careful planning was required to carry out civil works without affecting the estate’s aesthetics or landscaping. The charging stations were installed on custom-built stainless-steel posts that complement the surrounding estate furniture. Additionally, the chargers were customised with grey casements to blend seamlessly with the environment.

 

The system is now fully operational and integrated with the Future-Tap billing platform, providing residents with a simple and efficient way to access and utilise the charging stations.

 

Testimonials

Jamie Willsdon, Director of Future Group, commented:
“This was an exceptional project. By using bespoke components, we were able to deliver a flawless outcome. A big thank you to our civil engineering partners, Xtra Maintenance, for their crucial role in the installation.”

Mihai Lamba CIWFM, MIIRSM, TechIOSH, NEBOSH, Property Manager at BPM

“Future Group recently completed an electric vehicle (EV) charging points project for BPM for our client in Canary Wharf, and we couldn’t be more pleased with the results. Jamie, who led the project, was incredibly knowledgeable and instrumental in making sure every detail was handled with precision. He offered prompt and pertinent responses to any concerns we raised, which gave us confidence that we were in the best hands. Jamie ensured we were consistently updated with progress, making the entire process seamless from start to finish.

The feedback from the residents has been overwhelmingly positive. They are extremely happy with the outcome, appreciating both the functionality and the overall impact the project has had on our community. Future Group exceeded our expectations, and we highly recommend them for any future projects.”