Passive EV Charger Install

Future Fuel installs a fully passive infrastructure supplied by Easee.

Scope:

  • Installation of a full “passive” infrastructure, allowing residents to move over to EV simply and without any pain points.
  • Partnering with Easee Charging & Mina Billing portal, Future Group provided the most technically advanced solution available for the residential block sector.
  • Residents are issued with a personal RFID card providing secure access and personal billing solutions.

Easy Install

Long Lasting

Efficient

Easy to Scale

Utlising an Easee-Ready docking station system, our client now has a completely EV-ready charging point at low cost.

By pre-installing the infrastructure within the building, an additional charger can be deployed upon demand with the innovative “Plug & Play” technology; simply ‘Click’ it in the pre-installed body now installed in the resident’s bay.

The Charging Robot acts as an intelligent junction box and supports the expansion of multiple charging stations on the same cable.

The Installation:

The system was installed and commissioned over a nine-day period, making the entire car park ‘Future-proof’ and EV ready.

Location: Beaconsfield

Technology used: Easee

101 Load balancing units

22 Man kW charge

69% smaller than other chargers